Customers Passed SAP C_TS422_2504 Exam
Average Score In Real C_TS422_2504 Exam
Questions came from our C_TS422_2504 dumps.
Getting ready for the SAP C_TS422_2504 certification exam can feel challenging, but with the right preparation, success is closer than you think. At PASS4EXAMS, we provide authentic, verified, and updated study materials designed to help you pass confidently on your first attempt.
At PASS4EXAMS, we focus on real results. Our exam preparation materials are carefully developed to match the latest exam structure and objectives.
When you choose PASS4EXAMS, you get a complete and reliable preparation experience:
Earning your SAP C_TS422_2504 certification demonstrates your professional competence, validates your technical skills, and enhances your career opportunities. It’s a globally recognized credential that helps you stand out in the competitive IT industry.
Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP SHANA Cloud Private Edition to be able to track use this information in all areas of logistics?
A. Process order management
B. Engineering change management
C. Quality management
D. Batch management
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.
A. Resource hierarchy
B. Resource selection
C. Resource matrix
D. Resource network
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.
A. Use batch determination.
B. Use the Batch Information Cockpit.
C. Use the batch whereused list.
D. Use batch derivation.
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.
A. Digital signature
B. Approved resources
C. Recipe approval
D. GMPcompliant flag
E. Batch record
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
A. Opening period
B. Total replenishment lead time
C. Float after production
D. Setup time
What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.
A. You can reschedule the operation using lead time scheduling.
B. You can reschedule the operation using infinite scheduling in a planning table.
C. You can reschedule the operation using finite scheduling in a planning table.
D. You can reschedule the operation in the Manage Work Center Capacity app.
Which chart types does the tabular planning table for capacity planning provide in SAP SHANA Cloud Private Edition? Note: There are 2 correct answers to this question.
A. Order (pool) chart
B. Capacity requirements chart
C. Orders (dispatched) chart
D. Work center capacities chart
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
A. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.
A. Queue time
B. Teardown time
C. Move time
D. Setup time
What is a work center hierarchy?
A. A group of alternative work centers for production structured in hierarchy levels by priorities
B. A group of alternative work centers providing a cumulative available capacity for production
C. A group of work centers in a production line being used in sequence for production
D. A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel